Kenwatt runs waiting AI and research jobs in the cheapest hours of the day. Computing centers pay less for power and can buy at market prices without fearing the spikes.

Power cost without Kenwatt

−€2,227

Power cost with Kenwatt

−€3,241

Saved on this day

€0

Real day-ahead prices for Germany from SMARD and Energy-Charts. A simulated 5 MW research cluster where 35% of jobs can wait up to 12 hours.

0+

Earliest new grid connection

Syna, the grid operator in Frankfurt's west, can only promise new connections beyond 2032.

Source: energate messenger
0

Hours of negative power prices

In 2025, Germany had so much wind and solar that producers paid consumers to take power for 573 hours.

Source: Bundesnetzagentur
−€0

Per megawatt hour, 1 May 2026

The lowest price of the year so far, at one o'clock on a sunny public holiday.

Source: Energy-Charts

Think of a washing machine that starts when power is cheapest. The laundry is still done on time. It just runs at a better hour.

  1. 01

    Spot the jobs that can wait

    Researchers already tell the cluster when they need results. Kenwatt reads that deadline and separates urgent work from work that can wait.

  2. 02

    Run them when power is cheap

  3. 03

    Prove it to the grid operator

14 September 2026 · a tight evening

Jobs that can wait

Whether a site buys power at market prices or at a fixed price, Kenwatt finds money in the same workload. Figures for a 5 MW cluster where 35% of jobs can wait up to 12 hours, replayed on every hour of 2025.

Already buying at market prices

Run waiting jobs in the cheapest hours

Every day, tomorrow's hourly prices are published at noon. Kenwatt plans each waiting job into the cheapest hours before its deadline.

€0

a year, 6.3% of the energy cost

On a fixed price today

Stop paying for protection you don't need

Fixed-price contracts carry a risk premium, historically around 10% over the market average. It buys protection from price spikes. A cluster that can step around the spikes can switch to market prices and keep that money, plus the savings on the left.

Next step

A faster grid connection

Once a site has a record of keeping agreed limits, that flexibility becomes something to offer its grid operator. German law allows early, flexible connections for sites that accept limits at peak times (§ 17 (2b) EnWG). We're validating this with grid operators in Rhein-Main before promising it to anyone.

See what runs now, what waits, what it saves, and whether the site is keeping its promise to the grid. Your rules decide. Urgent work never waits.

Try the dashboard

Overview

Active · 24 September 2026

Energy cost today

€10,910

Saved today

€780

Work moved

20 MWh

Grid limit

3.0 of 3.0 MW

  • Must run right away
  • Can wait
  • Without Kenwatt
  • Power price
  • Grid limit

Cluster head node

Watch-only first

For the first month Kenwatt only observes, then shows what it would have saved. You decide if it ever acts.

Uses Slurm's own controls

Holding, releasing, and power-capping jobs are built into Slurm already. Kenwatt adds no new hardware.

Research data stays put

Kenwatt sees job sizes, deadlines, and power, never the data or code inside a job.

Your rules, enforced

Urgent queues never wait, deadlines are never missed, and the cluster is never left idle below your floor.

01

University and research computing centers

Big shared clusters full of batch jobs with deadlines in days, not minutes. Our first pilots start here.

02

AI labs and GPU clouds

Training runs and batch inference can wait for the right hour. Live inference keeps running as it is.

03

New data centers waiting for power

Proven flexibility makes a flexible connection agreement possible, so the site can open before the grid upgrade is done.

One month on your cluster. Nothing moves. At the end you get a report of what Kenwatt would have saved and how much flexibility your site could offer the grid.